Setting Up The Platform; Figure 5. Setting Up The Pg9602 Electrical Connections - Fluke PG9000 Series Operation And Maintenance Manual

Piston gauges
Table of Contents

Advertisement

PG9602™ OPERATION AND MAINTENANCE MANUAL
2.3.1.1
The PG9000 Platform consists of the PG9000 Base, the PG9000 Remote
Electronics Module and the PG Terminal.
reference the call outs and proceed as follows:
 Place the PG9000 Base on the work surface in the desired orientation.
 Place the PG9000 Terminal and PG9000 Remote Electronics Module near
 Connect the PG9000 Terminal to the PG9000 Remote Electronics Module
 Connect the PG9000 Temperature - Humidity Probe to the PG9000 Remote
 Connect the PG DRIVER connectors on the PG9000 Remote Electronics
 Connect electrical power (100 to 240 VAC, 50/60 Hz) to the PG9000
 If an automated pressure generation / control component is being used,
© 2011 Fluke Calibration

Setting Up the Platform

Figure 5. Setting up the PG9602 electrical connections

Though the rear panel is usually in the back, any orientation can be used.
the base in the desired locations.
using the 25-pin cable supplied with the PG Platform.
Electronics Module either directly to the back panel or via the supplied TH
Probe extension cable.
Module and PG9000 Base using the 15-pin cable supplied with the PG
Platform.
Terminal using the power cable supplied. Any grounded power cable with a
standard IEC320-313 connection may be used.
establish communications between the automated pressure generation /
control component and the PG9000 Platform by connecting a 9-pin RS232
cable between the COM1 port of the generation / control component to the
PG9000 Platform COM3 port and setting up PG9000 to use an automated
pressure generation / control component (see Section 3.10.9). It is important
that the COM port settings on both instruments match.
If an external barometer is being used, establish communications between
the barometer and the PG9000 Platform by connecting the barometer's
RS232 port to the PG9000 Platform COM2 port and setting up PG9000 to
read and use the external barometer (see Section 3.12.5.4). Set the external
barometer head height (see Section 3.12.3.3).
Level the platform using the two leveling feet and the bubble level mounted
on the front of the platform. The front foot is stationary and not intended to
be part of the leveling adjustment.
Page
To set up the PG9000 Platform
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg9602

Table of Contents