Figure 24 Rpm Connections - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide
Step
Yes – go to Step 9.
9
Connect 407377704 RPM cable between RPMs as shown.
10
Set RPMs to unique addressed using RPM SW1 and DW2 rotary switches (refer to RPM manual).
Move 560 Ohm resistor from RPM in Initial frame to the last RPM in the daisy chain in the Supplemental frame.
11
Only the last RPM in the daisy chain should have the resistor.
After applying power
12
a.
Configure Plant Shunt 2 for Supplemental Frame -see Configure Millennium II Controller section.
b.
Configure the RPM channels per site installation instructions – refer to RPM manual.
850050111
Issue 03 August 2017
Action

Figure 24 RPM Connections

Connect RPMs
RPMs in Supplemental Frame?
No – go to next section.