Battery Or Battery Stand Mounted Frame; Sub-Frame Mounted Systems; Figure 13 Battery Stand Mount; Figure 14 Mount Sub-Frame - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide

Battery or Battery Stand Mounted Frame

Step
Verify that battery or battery stand is positioned to provide adequate ventilation space to the rear of the
equipment: 4" to solid surface, 6" to heat producing surface. Figure 13 shows the placement of the base of the
floor mounted frame to meet ventilation space requirements
Place and secure frame to battery or battery stand per instructions provided with the battery stand or
adapter.
1

Sub-frame Mounted Systems:

Sub-frame mounted systems can be mounted in any standard 23" equipment mounting rack or frame with EIA-310
standard 1-3/4" rack spaces or 1" standard rack spaces. The brackets are 36.75" (21U) tall. Comcode CC848819607 kit
provides two brackets and 20 12-24 mounting screws.
Step
Verify that the rack is positioned to provide adequate ventilation space to the rear of the equipment: 4" to solid
surface, 6" to heat producing surface.
Distance required to rear of mounting rails: 16.5" to solid surface, 18.5" to heat producing surface.
Position the sub-frame system in the rack as desired.
Secure the sub-frame system into the rack with at least (12) frame mounting screws, 6 screws per side.
Torque to 35 in-lb – 5/16 socket.
1
850050111
Issue 03 August 2017
Action

Figure 13 Battery Stand Mount

Action

Figure 14 Mount Sub-Frame

Minimum Distance to Surface
7.5" to Solid Surface
9.5" to Heat Producing Surface
Mounting
Rails
H5692448
18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-m seriesH5692448

Table of Contents