Figure 9 Dc Distribution 4 Bullet Panels; Figure 10 Dc Distribution - Bolt In Panel With Return Bar; Figure 11 Ne-M System - 22U - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide
DC Distribution and Battery Termination
Distribution panels are factory installed.
Examples

Figure 9 DC Distribution 4 Bullet Panels

Figure 10 DC Distribution – Bolt In Panel with return bar
22U System Examples
850050111
Issue 03 August 2017
26 Position Bullet Panel
26 Position Bullet Panel
26 Position Bullet Panel
26 Position Bullet Panel
26 Position Bullet Panel
26 Position Bullet Panel
12 Position Bolt-in Panel
with integrated return bar
Mounts in bottom 2
distribution panel
positions
Features
11 pair Battery and Return bus landings for battery
cables
LVBD Contactor option
26 Bullet Distribution positions per panel arranged for:
Bullet terminal breakers to 250A
TPS fuse holders for fuses to 70A
GMT Fuse Module - 6 position
12 Bolt-in positions
KS22012 circuit breaker
TPL-C Fuse holders
Distribution Panel Positions
System
Distribution Panel Positions
13U
18U
22U
Universal Power Shelves
Battery Return
Bus
AC Terminal
Blocks
1
Shelf
2
Positions
3
4
Rectifier Positions
Figure 11 NE-M System – 22U
H5692448
2
3
4
Battery Bus
Panel A
Panel B
Panel C
Panel D
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-m seriesH5692448

Table of Contents