Connect Central Office Ground (Cog); Connect Supplemental Frame; Figure 17 Co Ground Landing; Figure 18 Supplemental Frame - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide

Connect Central Office Ground (COG)

Step
Secure COG connection with provided hardware:
(2) 3/8-16 nut
(2) 3/8-inch lock washer
(2) 3/8-inch flat washer
1
If required by local code or practice, treat with an
oxidation inhibitor such as NO-OX.
Torque to 240 in-lb - 9/16" socket.

Connect Supplemental Frame

This section applies only to installations with an Initial and a Supplemental Frame.
The Initial Frame must be equipped with a Millennium II controller.
Interconnecting bus bars, hardware, and cables are shipped loose with the Supplementary Frame.
850050111
Issue 03 August 2017
Action
Lug landings are 3/8" on 1" centers
Lugs not provided.
Initial
Supplemental
Frame
Frame

Figure 18 Supplemental Frame

CO Ground
Lug Landing

Figure 17 CO Ground Landing

H5692448
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-m seriesH5692448

Table of Contents