Figure 27 Input Panel Screws; Figure 28 Partition Labels - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide
CAUTION:
Personal injury and Equipment Damage
PV Disconnect Panel with disconnects rated at 300Vdc on each PV conductor is required for use
with Solar Arrays (PV sources).
Step
1
Remove the Input Panel cover (4 captive screws).
Apply labels onto PV/AC Partition as shown.
Place "PV WIRING" label on the left (PV) side of partition.
2
Place the "AC WIRING" label on the right (AC) side of
partition.
Make space for the PV/AC Partition - Separate DIN rail Terminal
Blocks to make space for the PV/AC Partition.
3
Loosen screws securing all DIN spacer blocks to the left of the
Partition location specified in the site engineering instructions.
850050111
Issue 03 August 2017
Action

Figure 27 Input Panel Screws

Figure 28 Partition Labels

H5692448
28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-m seriesH5692448

Table of Contents