REPAIR AND REPLACEMENT PROCEDURES

Amplifier Assembly Removal

Amplifier Assembly Installation

COMPONENT REMOVAL AND INSTALLATION PROCEDURES
8 - 6
7. Coat the cylindrical part of the cell with a light coating of
the DRI-GLIDE sealant (Fig. 8-2).
8. Feed the characterization board and cell cable through the
opening in the bottom of the electronics housing, being careful
not to damage the cell cable.
9. Mount the cell into the electronics housing in the desired
orientation.
10. Install the cell lock and tighten the cell locking screw
(Fig. 8-3).
11. Mount the characterization board to the electronics hous-
ing and install the two screws (Fig. 8-1).
12. Align the rectangular opening on the bottom of the ampli-
fier assembly with the characterization board connector and
install the amplifier assembly into the electronics housing.
Gently press it down to seat the mating connectors.
13. Install the three screws to secure the amplifier assembly to
the electronics housing.
14. Grease the threads of the housing cover with a light film of
the DRI-GLIDE sealant.
15. Install the housing cover.
NOTE: There will be a delay after initial power up when a new cell
and characterization board assembly and amplifier assembly are
mated.
16. If this is a new cell and characterization board assembly,
and a configuration other than the standard factory configura-
tion is desired (Table 1-8), perform the configuration proce-
dures in
Section
5.
17. Perform the calibration procedures in
18. Install the transmitter on the process.
Perform Steps 1 through 4 in the
Board Assembly Removal
1. Refer to
Section 9
cover O-rings.
Section
Cell and Characterization
section.
and determine the proper replacement
4.