REPAIR AND REPLACEMENT PROCEDURES
O-Ring Replacement
OPTIONAL EQUIPMENT REMOVAL AND INSTALLATION PROCEDURES
Indicator Removal
Indicator Installation
OPTIONAL EQUIPMENT REMOVAL AND INSTALLATION PROCEDURES
8 - 10
9. Perform the calibration checks in
calibration has not changed.
10. Install the transmitter on the process.
All O-ring replacement procedures are incorporated in the
steps for the replacement of various transmitter components.
Use Figures 8-1, 8-2, and
these procedures.
1. Remove the transmitter from the process.
2. Remove the left housing cover from the electronics housing
(Fig. 8-3).
3. Remove the four screws that secure the indicator to the
amplifier assembly (Fig. 8-1).
4. Gently pull on the indicator to unplug it from the amplifier
assembly.
5. Remove the housing cover O-ring.
1. Align the connector on the back of the indicator with one of
the four meter openings in the amplifier assembly (Fig. 8-1).
The alignment of the connector depends on the desired viewing
orientation. Gently press the indicator down to seat the mating
connectors.
2. Install the four screws that secure the indicator to the
amplifier assembly.
3. Refer to
Section 9
and identify the housing cover O-rings.
4. Coat the O-rings with a film of Dow Corning No. 4 com-
pound and install.
5. Coat the threads of the housing cover with a light coating
of DRI-GLIDE sealant.
6. Install the housing cover.
7. Install the transmitter on the process.
Section 4
8-3
as visual aids when performing
to verify the
WBPEEUI110504A0