Pay attention to the following points during commissioning:
• Check function and adjustment of attachments
• Observe information for environment and operation
• Check protective measures against moving and live parts
Pay attention to the following points during operation:
• Listen for atypical noises
• Look out for smoke
• Always check gear unit surfaces and lines for
dirt, leakages, moisture or dust
• Check temperature development
• Check for lubricant leakage
• Observe recommended maintenance intervals
• Check function of safety devices
WARNING
Place the machine or plant in a safe state
Make sure that the rotor comes to a complete stop.
When the holding brake [+] is released, the rotor moves without
remanent torque. Rotating components can lead to serious in-
juries.
AG2250
Commissioning
───
83