During commissioning
9.2
Prerequisites during op-
9.3
eration
After operation
9.4
Version: 2.2
• Make sure that all fittings were checked for function and adjust-
ment
• Observe information for environment and operation
• Check protective measures against moving and live parts
• Pay attention to atypical noise development
• Pay attention to smoke development
• Always check gear unit surfaces and lines for
dirt, leakages, moisture or dust
• Check temperature development
• Check for lubricant leakage
• Observe recommended maintenance intervals
• Check function of safety devices
WARNING
Place the machine or plant in a safe state
Make sure that the rotor comes to a complete stop.
When the holding brake [+] is released, the rotor moves without
remanent torque. Rotating components can lead to serious in-
juries.
AG3210
Commissioning
───
55