6.- FILLING THE INSTALLATION

To fill the installation, it should be provided with a fill valve, which can be used to fill the
installation until a pressure of 1,5 - 1.5 bars appears on the "boiler pressure" setting on the
display. The circuit should be filled slowly and with the automatic air bleed valve cap (4) loose,
to let the air out of the installation. The air should also be bled from the rest of the installation
using the air bleed valves provided. When the installation has been filled, close the fill valve.
45º elbow 80/125
Cód. CGAS000183
Black tile 80/125
Cód. CGAS000074
L  10 mts. (TRO Evolution 20 System)
L  7 mts. (TRO Evolution 30 System)
90º elbow 80/125
Cód. CGAS000182
1m coaxial duct 80/125
Cód. CGAS000184
Black tile 80/125
Cód. CGAS000075
page -15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TRO Evolution System Series and is the answer not in the manual?

Table of Contents