Floor standing
oil fired central heating boilers
for external installation only (23 pages)
Summary of Contents for Trianco Combi 50 ECO
Page 1
TRIANCO FS EuroStar Combi Please read these instructions before installing, commissioning and using this appliance USER, INSTALLATION COMMISSIONING & SERVICING INSTRUCTIONS Combi 50/65 ECO BED 92/42 EEC Combi 70/90 ECO EMC 89/336 EEC To be retained by householder...
Page 2
HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEERS Under the Consumer Protection Act 1987 and the Health and Safety at Work Act 1974, it is a requirement to provide information on substances hazardous to health (COSHH Regulations 1988). The Company takes every reasonable care to ensure that these products are designed and con- structed to meet these general safety requirements, when properly used and installed.
CONTENTS PAGE 1. USER INSTRUCTIONS After sales service information 2. INTRODUCTION 3. TECHNICAL INFORMATION Technical Data Outline Dimensions Pump Curve Wiring Diagram 4. INSTALLATION Regulations Health and Safety Siting the Boiler Water Systems Water Systems Connection Functions of water circulation pump Combustion air conventional flue Ventilation (conventional flue boiler) Extraction fan...
TEMPERATURE CONTROL must be fitted where the temporary hardness is above 150ppm (or 10.5° clarke) Your Trianco Boiler is fitted with two adjustable tempera- BEFORE FIRING THE BOILER ture control thermostats to regulate the temperature of the domestic hot water and central heating.
Page 5
SYSTEM CONTROLS burner should fire. DO NOT PRESS MORE THAN TWICE. Refer to ‘Burner lock-out’ for further advice. ROOM THERMOSTAT Check for excess water temperature (Refer to ‘High Limit Thermostat’ for advice). The room thermostat should not be positioned near a source of heat such as a radiator or exposed to the sun as SERVICING this will cause the central heating to switch off before the...
The cause of a breakdown is due to other parts of the plumbing/heating system (including oil line/lack of What happens if my installer/engineer is unavail- oil), or with equipment not supplied by Trianco. able? Step 3: Contact Trianco Direct. We will provide •...
BE FITTED TO REDUCE THE HARDNESS TO BELOW Trianco balanced flue kit. These kits allow the boiler to be 150PPM OR (10.5° CLARKE), IF IN DOUBT CONSULT installed in a wide variety of site conditions, from low- level THE LOCAL WATER AUTHORITY.
EuroStar Combi 50/65 70/90 DIM A DIM B (to flue socket) DIM C (to flue socket) THE BOILER MAY BE INSTALLED SPACE REQUIRED FOR INSTALLATION AND MAINTENANCE BELOW A KITCHEN WORK SURFACE REAR NIL (mm) NIL (in) SO LONG AS THE SECTION IS SIDE LH/RH 20 (mm) 3/4 (in)
CHARGE AND INITIAL 0.5 bar 1.0 bar 1.5 bar Whilst the low sound level of the Trianco EuroStar Combi SYSTEM boiler makes it eminently suitable for kitchen and utility PRESSURE room installation, the following aspects should be considered before installation:...
Water System Connections System Filling Heating The appliance is designed for connection to sealed central heating water systems. Fig 6 shows a typical system Connect the appliance to the water system using the two design. stop valves supplied (copper compression fittings 22mm). A sealed system must only be fitted by a competent person The flow connection is on the right.
The following air openings are therefore required for A flue gas check on the CO2% and smoke must be carried Trianco EuroStar Combi boilers: out to provide that combustion is satisfactory. Minimum FREE Area Opening opening ‘A’=113cm...
Location and setting of DIL Switches Trianco Electronic Programmer - 2 Channel Version The DIL switches are located on the bottom right hand side of the rear of the unit. Specification Factory Settings Power Supply : 220/240Vac, 50/60 Hz Switching Action...
Additional Programming Steps for Warning - High and Low Voltage 5 Day/2 Day Operation In certain parts of the country, where there is a known risk of high or low voltage fluctuations, the oil burner shall be If the unit has been set for 5 Day/2 Day operation, the following additional steps must be made.
Single pipe oil supply The tank should be fitted with the fill and vent connection (Fig 11) (weather protected), a drain-off cock, shut off valve and an When, the bottom of the oil supply tank is above the burner, oil level indicator. a single pipe gravity system can be used.
The design and construction of the Trianco Balanced Flue Kits already takes these factors into account so the following Notes: guidance notes are for conventional chimneys.
Whereas some balanced flue boilers rely on case sealing As the flue system operates under positive pressure, to achieve a room seal, Trianco boilers have a sealed air it is essential to seal all flue joints. Apply a thin duct system which maintains the room sealed performance...
Trianco flue kits are designed to incorporate the latest ‘O’-ring seals. Before commencing assembly, please make sure that all ‘O’-rings seals are in position. 600mm HORIZONTAL TELESCOPIC BF KIT 1000mm HORIZONTAL TELESCOPIC BF KIT ASSEMBLY METHOD (Fig 16/17) ASSEMBLY METHOD (Fig 16/17) 1.
Trianco flue kits are designed to incorporate the latest ‘O’-ring seals. Before commencing assembly, please make sure that all ‘O’-rings seals are in position. ASSEMBLY METHOD (Fig 18/19) - High Level Adaptor Kit used with 600mm Horizontal Telescopic BF Kit...
Vertical Balanced Flue Kit The vertical balanced flue kit is designed to be telescopic in nature and incorporates the latest ‘O’ring seals. It is therefore unnecessary for any ‘cutting down’ of pieces to the required size. Please note that to facilitate the connection process, each section of pipe has a different diameter. The lowermost pipes have the smallest diameter, the size increasing with each subsequent section of pipe.
7 COMMISSIONING Open the CH flow and CH return valves. Remove the front Note : The burner may lock-out on first firing due to air in casing panel by pulling away the top and lifting clear of the the pump, if this happens, wait about a minute before bottom retaining tabs.
8. SERVICING Servicing the Boiler IMPORTANT: ISOLATE ELECTRICAL SUPPLY TO THE BOILER BEFORE SERVICING (Burner removed) To maintain the boilers high thermal efficiency and reliable Remove the flue-cover and lift out flue-baffles (See operation, it should be serviced annually by a qualified diagram below).
9. FAULT FINDING Burner ELECTRICITY SUPPLY - before making any electrical checks, switch off mains supply to boiler. FAULT POSSIBLE CAUSE ACTION BURNER FAILS TO Control box locked out - Light on Press control box reset button NB only try twice START Limit-stat tripped Press reset button under control panel and...
Page 37
FAULT POSSIBLE CAUSE ACTION POOR FLAME CUT-OFF Air in pump or at back of nozzle Bleed pump through pressure gauge port, also check for leaks in oil line if 2-pipe system. Oil contaminated with water Run off oil at burner until free of water and drain condensation from tank.
Page 38
Hot Water Fault Finding Turn to HW only switch DHW stat to max Allow 25 minutes from initial switch on for tank to heat CHANGE NO HOT WATER RELAY IS THERE 230V ON TERMINAL 4 SWITCH OFF TAPS OF TERMINAL BLOCK IS PUMP CHANGE IS THERE 230V ON...
Page 39
Central Heating Fault Finding Allow 25 minutes from initial switch on for tank to heat DOES DHW WORK GO TO DHW FAULT FINDING IS THERE 230V ON TERMINAL 2 DOES DHW WORK OF TERMINAL BLOCK IS THERE 230V CHECK TURN OFF POWER SUPPLY TO ON TERMINAL W SUMMER/WINTER BOILER.
Need help?
Do you have a question about the Combi 50 ECO and is the answer not in the manual?
Questions and answers