3.10
Initial operation
Avoid the wastewater pump(s) running dry at all costs, it/they could become damaged. Never switch
wastewater pumps on if the wastewater tank is not filled at least to the minimum level.
3.10.1 Initialising the control unit
•
Connect the control unit to the mains supply, initialisation begins. While the LEDs light up for approx. 4
seconds, the electrical components are checked, the battery for power outage signals actuated and menu
3.10. Language displayed. Then initialisation can be carried out.
During initialisation, the following input is expected:
Language
– Date / Time
– Product type
– System variant
– Capacity
– Maintenance interval
Language
•
Press OK
•
Select the required language using the cursor keys and confirm with OK, the date/time menu then appears.
Date / Time
•
Set the flashing figures in date and time one by one and confirm with OK. Following the last entry, the menu
Product type
Product type
•
Select pumping station Aqualift Mono or Duo and confirm with OK, the menu
System variant
•
Select the appropriate system variant and confirm with OK, the menu
Capacity
•
Select the appropriate capacity and confirm with OK, the menu
Maintenance interval
•
Select the maintenance interval you require or enter accordingly and confirm with OK, the menu
information
appears, initialisation is complete.
3.10.2 Setting up the KESSEL tele-control modem for fault messages
(Option) In menu item 3.9, it is possible to define which incidents of thepump stationare to be sent to which text
message recipient.
appears.
Installation
Maintenance date
58 / 240
System variant appears.
Capacity
appears.
appears.
System
2016/05