Cabinet Power Switches And Circuit Breakers; Sps Power Switches - EMC VPLEX Installation And Setup Manual

With geosynchrony 4.1
Table of Contents

Advertisement

Installing the Hardware
Figure 13
Figure 14
28
EMC VPLEX with GeoSynchrony 4.1 Installation and Setup Guide
ON
I
O
OFF
ON
I
O
OFF
ON
I
O
OFF
PDP power
switch
To 30 A, 220 VAC
power source 2

Cabinet power switches and circuit breakers

4. Switch all SPS power switches (shown in
ON

SPS power switches

5. Switch both lower PDPs ON.
6. Switch ON each PDU circuit breaker that has components plugged into its power
strip.
(Figure 64 on page 91
power strip.)
7. Verify that the LED status on each SPS and director is as shown in
page
29.
Generally, the SPS On-Battery LED stays on while the SPS units fully charge
(which could be a few minutes or a few hours, depending on the state of the
battery). If any amber LED not related to the SPS recharge remains on for
more than 10 minutes, verify that the components are cabled correctly.
Notes:
ON
I
O
OFF
ON
I
O
OFF
ON
I
O
OFF
PDU circuit
breakers
To 30 A, 220 VAC
power source 1
Figure
ON
CL4171-zep
identifies the circuit breaker associated with each
The upper PDPs are installed,
but are not used.
The upper PDUs are not used in a
single-engine configuration.
The upper PDUs are installed
upside-down from the lower PDUs.
PDP power
switch
14) ON.
Figure 15 on
Zep-013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents