Task 3: Stabilize The Equipment; Engine Components: Front View - EMC VPLEX Installation And Setup Manual

With geosynchrony 4.1
Table of Contents

Advertisement

Figure 7
Task 3: Stabilize the
equipment
Table 2
5. From the front of the cabinet, remove each engine's bezel as shown in
and verify that the two power supply modules, four fan modules, and solid state
drive (SSD) enclosure are fully inserted and secure.
Power supply
Fan
SSD enclosure

Engine components: Front view

The equipment requires time to become acclimated to a data center environment.
Table 2
lists the required times.
Data center acclimation times
Transit/storage environment
Condition
Temperature range
o
o
o
Nominal
68
to 72
F (20
o
Cool / Damp
Less than 68
F (20
Cold / Dry
o
o
o
Hot / Dry
72
to 90
F (22
a
Hot / Humid
a. Temperature and humidity values must be such that condensation does not occur on any VPLEX component.
Relative humidity
o
to 22
C)
Less than 30%
o
C)
30% or greater
Less than 20%
o
to 32
C)
Less than 30%
30% to 45%
45% to 60%
60% to 80%
Installing the Hardware
Figure 7
CL4341c
Hours required
before applying
power
0
4
8
16
Installing a cluster
,
23