Installing A Cluster; Task 1: Unpack And Set Up The Cabinet; Task 2: Check The Components; Directors And I/O Module Carrier - EMC VPLEX Installation And Setup Manual

With geosynchrony 4.1
Table of Contents

Advertisement

Installing the Hardware

Installing a cluster

Task 1: Unpack and
set up the cabinet
Task 2: Check the
components
Figure 5
Figure 6
22
EMC VPLEX with GeoSynchrony 4.1 Installation and Setup Guide
Follow the steps in the EMC 40U-C Cabinet Unpacking and Setup Guide, which
accompanies each VPLEX cabinet (and is available on Powerlink).
To confirm that no components loosened during shipping:
1. From the rear of the cabinet, push each director and the I/O module carrier
(shown in
Figure
5) inward, to verify that these components are fully seated.

Directors and I/O module carrier

If any of these components is not fully seated, loosen the orange captive screws,
push the component firmly into the backplane, and retighten the thumbscrews.
2. Confirm that all I/O modules are fully seated.
3. Confirm that all thumbscrews are finger-tight.
4. Confirm that all cables in the cabinet (except AC cables to site power) are securely
connected, and that the wire bail on each SPS power cable, as well as (if present)
each UPS and Fibre Channel switch power cable, is secure.
The bail on each SPS and UPS cable must be clamped onto the plug's plastic
molding, and the bail on each Fibre Channel switch must be clamped onto the
cable itself, as shown in
SPS and UPS:
The wire cable bail is inserted into
the middle of the plug's plastic molding.

Power cable wire bails

If any cable has become disconnected, reconnect it as identified by the labels on
the cable and cabinet, as well as
Director "n" B
Director "n" A
I/O module carrier
Figure
6.
The wire cable bail is against
the end of the plug's plastic molding.
"Internal cabling" on page 80
Zep-041
Fibre Channel switch:
SYM-002500z
of this guide.