Schulte SRW800 Operator’s Manual With Parts Listing page 71

Rock windrower
Table of Contents

Advertisement

MAINTENANCE
SLIPCLUTCHES
Install the bushing (3) in the flange yoke (2). Assemble
the other parts of the clutch as shown in the previous
diagram. Avoid contamination of the surfaces with any oil
or grease.
Fully loosen the four socket head screws.
Install the eight bolts. Tighten the bolts progressively and
in an alternating pattern in order to compress the spring
uniformly.
Tighten the bolts to 27 N/m (20 Ft/lbs).
Back each nut off by 1/4 turn. The spacer ring (8) Should rotate freely.
If spacer ring does not rotate freely, back each nut off an additional 1/8" turn. Continue backing each nut off 1/8"
turn until spacer ring rotates freely.
Re-insert the taper pin into the hub.
Maintenance Section 5-5
SRW800 07/03
© 2003 Alamo Group Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents