Control Cables Interconnection - ABB MegaFlex 1000 UL S1 Installation Manual

Hide thumbs Also See for MegaFlex 1000 UL S1:
Table of Contents

Advertisement

26/54

4.7.3 Control cables interconnection

Note!
All the cables interconnection must be performed only by an ABB Service Technician!
MegaFlex 1000 to 1600 - Control cables interconnection
Connector XD
(46 poles)
Board
P25 - IM0323
Connectors Interface
XD
(46 poles)
Module not available in the
MegaFlex 1000 - 1100 - 1200
Power Section cabinet
Fig. 4.7.3-1 MegaFlex 1000 to 1600 – Control cables interconnection
Connection
XD – HAN Connector male (46 p.)
Fig. 4.7.3-2 Connection HAN connector
6x – Connector 4 wires
6x – Connector 26 poles
2x – Connector J45
F ROM PM
TO EL
J20
J17
TO PM
FRO M EL
IM032 3 - 8600268459P
B AR CODE
Board P25 - IM0323 - Connectors In terface
In/Out Section cabinet
From (already connected)
"In/Out Section" cabinet
Note!
All these connections must be performed only by an ABB Service
Technician!
Proper dressing needs to be done for each cable assembly in order to reduce
the stress.
All the cables must be sufficiently (at least 4"/10cm) away from all live parts.
Cable binders used to support the wiring must not be overly tightened.
"In/Out Section" cabinet
"In/Out Section" cabinet
"In/Out Section" cabinet
MegaFlex 1000 to 1600
J10
J9
J8
J3
J2
J1
J21
J18
J 10pm
J9 pm
J 8pm
J 3pm
J2pm
J1 pm
Connector J45
Connector 4 wires
2x / 1_CAN & J2_CAN
6x / J1 - J2 - J3 - J8 - J9 - J10
Connecting to
"Power Section" cabinet - HD Connector
"Power Section" cabinet / Board "P25 - IM0323"
J1 - J2 - J3 - J8 - J9 - J10
"Power Section" cabinet / Board "P25 - IM0323"
J16 - J17 - J18 - J19 - J20 - J21
"Power Section" cabinet / Board "P25 - IM0323"
J1_CAN and J2_CAN
UPS Installation Guide / REV-A
J19
J16
Connector 26 poles
6 x / J16 - J17 - J18 - J19 - J2 0 - J21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents