4.5 Ventilation and cooling

Fig. 4.5-1 Installation on plain floor
The heat produced by the UPS is transferred to the environment by its ventilation.
Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the cabinet.
A suitable ventilation or cooling system must be installed to extract the heat from the UPS room.
Note!
Do not put anything on the top of the cabinet.
18" (460mm) of air clearance from the top must be left free of any object for a sufficient exhausted
air exchange, proper cooling, service access and safety.
Air filtering systems could be required when the UPS operates in a dirty environment.
In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air exhaust
flow rate requirement of the UPS system.
Contact your ABB Service Center for appropriate solutions.
The below table indicates the heat dissipation at full Load at PF = 1 and charged Battery, up to 3280 ft (1000 m)
altitude, for cooling air 77°F (25°C) to 86°F (30°C).
UPS model
PF = 1
MegaFlex 1000
145914 BTU/hr
MegaFlex 1100
156427 BTU/hr
MegaFlex 1200
166209 BTU/hr
MegaFlex 1500
202223 BTU/hr
MegaFlex 1600
209810 BTU/hr
Note!
Even when eBoost™ Operating Mode option is available, the ventilation and cooling system shall be
rated as for operation in VFI mode.
Losses
VFI
PF = 1
42753 kW
55495 BTU/hr
45833 kW
57171 BTU/hr
48699 kW
58152 BTU/hr
59252 kW
62179 BTU/hr
61475 kW
60736 BTU/hr
MegaFlex 1000 to 1600
Cables
Fig. 4.5-2 Installation on raised floor
eBoost™ (option)
16260 kW
16751 kW
17039 kW
18219 kW
17796 kW
UPS Installation Guide / REV-A
Cooling air flow
VFI
PF = 1
7339 CFM
12469 m
7868 CFM
13368 m
8360 CFM
14204 m
3
10172 CFM
17283 m
10553 CFM
17930 m
3
/h
3
/h
3
/h
/h
3
/h