ABB MegaFlex 1000 UL S1 Installation Manual page 46

Hide thumbs Also See for MegaFlex 1000 UL S1:
Table of Contents

Advertisement

46/54
Note!
To operationalize this function, in case that the UPS was provided with one or more cards
"Customer Interface" (max. 3 - see Chapter 5), there must be on each card the following:
- Remove the cable short-circuiting terminals X2 / 1, 2 (see Fig. 4.11.4-3).
- Remove the Jumper JP2 (see Fig. 4.11.4-3).
8
7
6
4
5
3
2
1
19
18
16
17
15
13
14
12
Fig. 4.11.4-3 X2 terminal block and Jumper JP2 on the "Customer Interface" board
When the "EPO - Emergency Power Off" has been activated, the system must be restored as follows:
· Realize the push-button "EPO - Emergency Power Off" (contact on XA / EPO-1, EPO-2 is closed again).
· Perform the "Inverter OFF" command from the screen:
Commands 1 / Inverter / OFF.
(see User Manual to Section 6.5).
In case of a Parallel System perform the "Inverter OFF" command from the screen "Commands
1 / Inverter / OFF" of each unit connected on the Parallel Bus and having its output switch "Q1 -
UPS Output - External, supplied by others" closed.
2
1
10
11
9
21
22
20
X2
MegaFlex 1000 to 1600
X1
IM0171
X2
J1
CUSTOMER INTERFACE
UPS Installation Guide / REV-A
JP2
J1
JP2
X1
X2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents