Recent Change (Rc/V) - Lucent 5ESS DRM User Manual

Distinctive remote module
Table of Contents

Advertisement

®
5ESS
SWITCH DISTINCTIVE REMOTE MODULE
2.9.7 Supplemental Trunk and Line Work Station (STLWS)
The Supplementary Trunk and Line Work Station (STLWS) is an optional local
interactive menu interface used to test, monitor, or measure trunks and lines. The
STLWS terminal is a Display Administration Process (DAP) type terminal. This means
the office personnel can perform the same functions or commands from the STLWS
that can be performed from the MCC, with the exception of being able to access the
EAI page display.
Some of the operations that may be performed using the STLWS are as follows:
Controlling lines and trunks being tested
Monitoring a short circuit
Measuring/sending frequencies
Making continuous metallic measurements
Providing remove or restore commands used for testing.

2.9.8 Recent Change (RC/V)

The RC/V system is a function that allows maintenance personnel access to a DRM's
database. A DRM's database is a stand-alone ODD that is separate from the database
at the Host. The RC/V system is used to add to, delete from, update, or verify a DRM's
database. A stand-alone RC/V subsystem is provided at the DRM. Therefore,
Operational Support System (OSS) interfaces are not required to use RC/V
capabilities. The stand-alone RC/V enables office and/or maintenance personnel to
change or verify the DRM's database using video displays and menu selection via a
cut-through to the DRM through the ASM as explained in the 235-200-145, 5ESS
Switch OneLink Manager Administrative Services Module (ASM) User's Guide. For
detailed information applicable to RC/V procedures, see 235-118-XXX (where XXX =
the document number associated to the applicable software release), 5ESS Switch
Recent Change Manual, 235-000-000, 5ESS Switch Division 235 Numerical Index, and
associated documents.
Recent Change and Verify (RC/V) is a process used to modify each DRM's Office
Dependent Data (ODD). RC/V:
isolates the administrative process from the actual modification-of-the-data-base
process
provides a user-friendly view of the database.
The RC/V system is composed of many user interfaces which allow personnel to modify
or verify the contents of the ODD. The RC/V facility currently provides the following
interfaces:
RC/V Menu Interface - immediate and batch release
RC/V Text Interface - immediate and batch release
Office Records (OFR)
Recent Change Operations Systems (RCOS) Interface
Facility Management (FM).
Page 2-56
235-200-150
Feburary 2007
Issue 3.00O

Advertisement

Table of Contents
loading

Table of Contents