3.3 Installation Process

Remove the protective plastic bag from the cabinet only immediately before installation. Do
not remove the bag during equipment room renovation or infrastructure construction;
otherwise, dust may enter the cabinet and affect the internal components.
Figure 3-12 Installation flowchart

3.4 Checking the nitrogen pressure

Context
Procedure
Step 1 Open the door lock using a key, and open the cabinet rear door.
Step 2 Unfasten the rotating baffle plates, and remove the air filters.
Issue 07 (2020-03-16)
The device has been injected with 0.3–0.5 MPa nitrogen before delivery. Check the
nitrogen pressure for nitrogen leakage.
You can open or close the exhaust valve using a flat-head screwdriver.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
37