NetCol5000-C(065, 080) In-row Chilled Water Smart
Cooling Product
User Manual
Figure 3-16 Removing the connecting kit that secures the cabinet to the pallet
1.
2.
3.
Save the removed bolts for future use.
Step 2 Transport the cabinet to the specified position. You are advised to use a pallet truck to
transport devices.
Exercise caution when moving the cabinet to prevent falling down.
----End

3.6 Leveling and Combining Cabinets

Procedure
Step 1 Level the cabinet. Use a socket wrench to adjust the leveling feet at the bottom of the smart
cooling product, and use a measuring tape and a level to adjust the horizontal and vertical
distances of the smart cooling product. Ensure that the leveling feet touch the floor after
adjustment, as shown in
Issue 07 (2020-03-16)
Use a 10# socket wrench to remove eight M6x16 bolts that secure the connecting kit to
the cabinet.
Use an 18# socket wrench to remove four M12x35 bolts that secure the connecting kit to
the pallet.
Remove the connecting kit.
Figure
Copyright © Huawei Technologies Co., Ltd.
3-17.
3 Installation
40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-c065Netcol5000-c080

Table of Contents