Initial System Field Test; Preventive Maintenance - Raven SCS 4600 Operator's Manual

Hide thumbs Also See for SCS 4600:
Table of Contents

Advertisement

INITIAL SYSTEM FIELD TEST

1)
Drive down field or road at target speed with sprayer booms off, to verify SPEED readout on Console.
2)
Turn on sprayer and booms and place the console in AUTO mode. Increase or decrease speed by
one MPH [2 km/h]. The system should automatically correct to the target application rate.
3)
If for any reason, the system is unable to correct to the desired RATE, check for an empty tank, a
plugged line, a malfunctioning pump, improper vehicle speed, or a defect in the system.
4)
If the system does not appear to be correcting properly, first review INITIAL SYSTEM SET-UP, then
refer to TROUBLESHOOTING GUIDE.
5)
At the end of each row, switch the MASTER ON/OFF to OFF to shut off flow. This also shuts off
the area totalizer.
6)
Verify area covered and volume used.

PREVENTIVE MAINTENANCE

Preventive maintenance is most important to assure long life of the system. The following maintenance
procedures should be followed on a regular basis:
1)
Flush entire system with water after use of suspension type chemicals. Failure to clean system can
result in crystallization of chemicals which may plug the Flow Meter, lines, and/or tips.
2)
Flush and drain sprayer before storing. FREEZING TEMPERATURES MAY DAMAGE FLOW
METER IF WATER IS NOT DRAINED.
3)
Remove Flow Meter at the end of each spraying season. Clean Flow Meter turbine and inlet hub.
Clean off all metal filings and wettable powders which have hardened on the plastic and metal parts.
Check the inlet hub and turbine assembly for worn or damaged turbine blades and bearings. Flush
Flow Meter with clear water and drain.
4)
Remove Console when not in use for extended periods.
KEEP FROM FREEZING
31
(LIQUID APPLICATIONS)
(LIQUID APPLICATIONS)

Advertisement

Table of Contents
loading

Table of Contents