Initial System Field Test; Preventive Maintenance - Raven SCS-330 Installation & Service Manual

Sprayer flow
Table of Contents

Advertisement

INITIAL SYSTEM FIELD TEST

1)
1)
1)
1)
1)
Drive down field or road at target speed with sprayer booms OFF, to verify SPEED
readout on Console.
2)
2)
2)
Turn MASTER switch and BOOM switches to ON. Place the OFF/MAN/AUTO switch to AUTO.
2)
2)
Increase or decrease speed by one MPH [2 km/h]. The system should automatically
correct to the target application rate.
3)
3)
3)
If for any reason, the system is unable to correct to the desired RATE, check
3)
3)
for an empty tank, a plugged line, a malfunctioning pump, improper vehicle speed,
or a defect in the system.
4)
4)
4)
4)
4)
If the system does not appear to be correcting properly, first review INITIAL
SYSTEM SET-UP, then refer to SERVICE MANUAL and TROUBLESHOOTING GUIDE.
5)
5)
5)
At the end of each row, place the MASTER switch to OFF to shut off flow.
5)
5)
also shuts off the area totalizer.
6)
6)
6)
6)
6)
Verify area covered and volume used.

PREVENTIVE MAINTENANCE

Preventive maintenance is most important to assure long life of the system. The
following maintenance procedures should be followed on a regular basis:
1)
1)
1)
1)
1)
Flush entire system with water after use of suspension type chemicals.
to clean system can result in crystallization of chemicals which may plug the
Flow Meter, lines, and/or tips.
2)
2)
2)
2)
2)
Flush and drain Sprayer before storing.
METER IF WATER IS NOT DRAINED.
METER IF WATER IS NOT DRAINED.
METER IF WATER IS NOT DRAINED.
METER IF WATER IS NOT DRAINED.
METER IF WATER IS NOT DRAINED.
3)
3)
3)
3)
3)
Remove Flow Meter at the end of each spraying season.
and inlet hub.
hardened on the plastic and metal parts. Check the inlet hub and turbine assembly
for worn or damaged turbine blades and bearings.
water and drain.
4)
4)
4)
Remove Console when not in use for extended periods.
4)
4)
Clean off all metal filings and wettable powders which have
KEEP FROM FREEZING
KEEP FROM FREEZING
KEEP FROM FREEZING
KEEP FROM FREEZING
KEEP FROM FREEZING
FREEZING TEMPERATURES MAY DAMAGE FLOW
FREEZING TEMPERATURES MAY DAMAGE FLOW
FREEZING TEMPERATURES MAY DAMAGE FLOW
FREEZING TEMPERATURES MAY DAMAGE FLOW
FREEZING TEMPERATURES MAY DAMAGE FLOW
Flush Flow Meter with clear
21
Failure
Clean Flow Meter turbine
This

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents