Mounting The Control Valve (Liquid Applications) - Raven SCS 4600 Operator's Manual

Hide thumbs Also See for SCS 4600:
Table of Contents

Advertisement

2.
MOUNTING THE CONTROL VALVE
1)
Mount the motorized Control Valve in the main hose line between the Flow Meter and the booms,
with motor in the upright position. (For flow less than 3 GPM [11 lit/min], the motorized Control Valve
is mounted in a by-pass line. Refer to Appendix 2 for alternate plumbing diagram).
2)
Connect the Product Cable connectors to boom valves, Flow Meter, and motorized Control Valve
(Reference Figure 1). NOTE: Black wire to boom valve #1, Brown wire to boom valve #2, Blue wire
to boom valve #3, Black/White wire to boom valve #4, Brown/White wire to boom valve #5, Blue/Wht
wire to boom valve #6, White/Black wire to boom valve #7, White/Brown wire to boom valve #8,
White/Blue wire to boom valve #9 and Pink wire to boom valve #10.
(LIQUID APPLICATIONS)
8

Advertisement

Table of Contents
loading

Table of Contents