Generator Replacement Procedure

5. Preparation for operation

(1) Turn on the power supply circuit breaker for the
outdoor unit.
(2) Open the main gas valve, starting the fuel supply.
(3) Set the STOP SW (S001) from STOP to NORM.

6. Final check

(1) Running condition check
Make sure that no abnormal noise or vibration occurs.
Make sure that none of the attached parts are loose.
(2) Cleanliness check of the surroundings
Make sure no unneeded items or trash is scattered around.
Make sure no tools, etc. have been forgotten within the unit.
Use rags to wipe up any water or oil that has accumulated in the bottom of the unit.
<Supplemental Notes>
Nut/Bolt Slip Marker
Painting slip markers as shown in Figure 13 onto the bolts and nuts that were tightened to their speci ed torques
allows them to be checked for looseness with a visual inspection.
Nut
82
Figure 12
Bolt
Figure 13