Panasonic U-16GE2E5 Main Parts Replacement page 3

Gas heat pump, 2way/3way multi/w multi
Hide thumbs Also See for U-16GE2E5:
Table of Contents

Advertisement

1.
Required parts and tools used ...........................................................................21
2.
Preparation for work ............................................................................................21
3.
Remove starter .....................................................................................................21
4.
Install starter .........................................................................................................21
5.
Preparation for operation ....................................................................................21
6.
Final check ............................................................................................................21
1.
Required parts and tools used .......................................................................... 22
2.
Preparation for work ........................................................................................... 22
3.
Ignition coils (with built-in power transistors).................................................. 22
4.
Crank angle sensor (Figure 2) ............................................................................ 22
5.
Cam angle sensor ............................................................................................... 23
6.
Spark plugs .......................................................................................................... 23
7.
Preparation for operation ................................................................................... 24
8.
Final check ........................................................................................................... 24
1.
Preparation for work ........................................................................................... 25
2.
Distributor mode setting .................................................................................... 25
3.
Start test operation and set engine rotational speed ...................................... 26
4.
Ignition timing check .......................................................................................... 27
5.
Correction for distorted amount ........................................................................ 28
6.
Cancel settings .....................................................................................................31
7.
Stop test run .........................................................................................................32
8.
Final check ............................................................................................................32
1.
Required parts and tools used .......................................................................... 33
2.
Preparation for work ........................................................................................... 33
3.
Remove compressor drive belt. ......................................................................... 33
4.
Remove the crank pulley .................................................................................... 33
5.
Remove front cover oil seal (Figure 2) ............................................................... 33
6.
Install the front cover oil seal (Figure 3) ............................................................ 34
7.
Install the crank pulley. ....................................................................................... 34
8.
Install the compressor drive belt. ...................................................................... 34
9.
Preparation for operation ................................................................................... 34
10. Final check ........................................................................................................... 35
1.
Required parts and tools used .......................................................................... 36
2.
Preparation for work ........................................................................................... 36
3.
Remove the ywheel ........................................................................................... 36
4.
Remove the oil seal ............................................................................................. 36
5.
Oil seal installation ...............................................................................................37
6.
Preparation for operation ....................................................................................37
7.
Final check ............................................................................................................37

Advertisement

Table of Contents
loading

Table of Contents