Pump Down Procedure (Common to Cooling and Heating)
Items 6 to 8 below describe the work for the outdoor main board.

6. Start the test run: Carry out a test run on the outdoor unit.

* Select the test run mode (cooling or heating) in accordance with the pump-down mode.
(1) Press the HOME (S004) key for 1 second or more. Menu item number "
(2) Press the UP (S005) / DOWN (S006) key and select
menu item number "
display "
(3) Press the SET (S007) key. "
will be displayed. The LEVEL LED (D053) will be
illuminated.
(4) Press the UP (S005) key or DOWN (S006) key to
select the test run mode.
• Cooling mode: "
• Heating mode: "
(5) Press the SET (S007) key for 1 second or more.
The TEST/WARNING LED (D052) will be illuminated,
and the outdoor unit will start test operations.
".(Figure 9). The
" (Figure 10) will appear.
" (Figure 11)
" (Figure 11)
" (Figure 12)
Figure 11
72
" will be displayed.
Figure 9
Figure 10
Figure 12