Coolant Pump Replacement Procedure; Required Parts And Tools Used; Preparation For Work; Prepare To Remove The Coolant Pump - Panasonic U-16GE2E5 Main Parts Replacement

Gas heat pump, 2way/3way multi/w multi
Hide thumbs Also See for U-16GE2E5:
Table of Contents

Advertisement

Coolant Pump Replacement Procedure

1. Required parts and tools used

Part names and tools used
Coolant pump
Clamps
Rags
General tools

2. Preparation for work

(1) See
1.Safety Precautions
"

3. Prepare to remove the coolant pump

(1) Drain the coolant inside the unit.
For details of the coolant draining procedure, see "Coolant Check, Replenishment and Replacement Procedure"
in this manual.

4. Remove the coolant pump

(1) Unplug the connector for the coolant pump from the power board in Figure 1.
Caution
Remove the connector after verifying that the power breaker has been turned off.
Removing the connector with the power supply still on may lead to damage to the unit.
(2) Remove the wires from the clamp.
(3) Spread rags around the coolant pump and
disconnect the coolant hose (on the coolant pump
side).
(4) Remove the 4 securing bolts shown in Figure 2 and
pull out the coolant pump.
Remarks
623-175-8376
As needed
As needed
1 set
and
2.Preparation for Work
"
"
Power board
Figure 1
51
under
Basic Operations
"
"
Connector for coolant pump
Securing bolts
Figure 2
in this manual.
"
Coolant hoses

Advertisement

Table of Contents
loading

Table of Contents