25. Preparation for operation

(1) Turn on the power supply circuit breaker for the
outdoor unit.
(2) Open the main gas valve, starting the fuel supply.
(3) Set the STOP SW (S001) from STOP to NORM.
(Figure 35)

26. Coolant Replenishment

For details on the coolant replenishment procedure, see "Coolant Inspection, Replenishment, and Replacement
Procedure" in this manual.

27. Final check

(1) Running condition check
Make sure that no abnormal noise or vibration occurs.
Make sure there are no coolant or oil leaks.
Make sure that none of the attached parts are loose.
(2) Cleanliness check of the surroundings
Make sure no unneeded items or trash is scattered around.
Make sure no tools, etc. have been forgotten within the unit.
Use rags to wipe up any water or oil that has accumulated in the bottom of the unit.