SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
Figure 5-18 Connecting cables
----End
5.9 Connecting the Three-phase AC Power Cable (a Knife
Fuse Switch as the Three-Phase Input Switch)
Context
Issue 05 (2019-01-20)
For the smart array controller with one PID module, connect the three-phase AC power
cable to the FU01 switch, and the functional ground cable to the FE01 port on the
functional ground bar.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
70