Preparing Cables - Huawei SmartACU2000B Series User Manual

Smart array controller with pid modules, 800 v ac
Hide thumbs Also See for SmartACU2000B Series:
Table of Contents

Advertisement

SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
Figure 5-4 Installing tube fitting
Step 3 Route the cable through the tube conduit and then fitting.
Step 4 Connect the cable.
Step 5 Secure the fitting to the conduit.
Step 6 Check that the cable is connected correctly and securely. Then take appropriate measures to
ensure that the tube conduit and fitting are secured reliably, and seal the cable hole using
supplied firestop putty.
Step 7 Clear foreign matter from the cabinet.
----End

5.2 Preparing Cables

The cables used for the smart array controller need to be prepared by yourself. Prepare cables
by following the instructions in
Issue 05 (2019-01-20)
2.6 Configuration
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
Scenario.
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents