Huawei SmartACU2000B Series User Manual page 7

Smart array controller with pid modules, 800 v ac
Hide thumbs Also See for SmartACU2000B Series:
Table of Contents

Advertisement

SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
5.5 Connecting Communications Cables for the Fiber Ring Network ............................................................................. 58
5.5.1 Connecting the Optical Jumper from the SmartLogger to the Fiber Adapter .......................................................... 58
5.5.2 Connecting Cables to the ATB ................................................................................................................................. 59
5.6 Connecting the 4G LTE Cable (with the POE SPD) ................................................................................................... 63
5.7 Connecting the 4G LTE Cable (with no POE SPD) .................................................................................................... 66
5.10 Connecting Peripheral RS485 Communications Cables ........................................................................................... 72
5.11 Connecting the LAN Switch Cable ........................................................................................................................... 74
5.12 Connecting the Peripheral Network Cable ................................................................................................................ 75
5.13 Connecting the 24 V DC Output Power Cable ......................................................................................................... 77
5.14 Connecting the 24 V DC Input Power Cable ............................................................................................................ 78
5.15 Connecting the Single-Phase AC Power Cable ......................................................................................................... 79
5.16 Connecting the DO/AO/DI/AI Signal Cable ............................................................................................................ 80
6 System Commissioning ............................................................................................................. 82
6.1 Checking Before Power-On ........................................................................................................................................ 82
6.2 Powering On the System............................................................................................................................................. 82
6.3 Closing the main Cabinet Door .................................................................................................................................. 83
6.4 Powering Off the System ............................................................................................................................................ 85
7 System Maintenance .................................................................................................................. 87
7.1 Routine Maintenance .................................................................................................................................................. 87
7.2 Troubleshooting .......................................................................................................................................................... 88
7.3 Component Replacement ............................................................................................................................................ 89
7.3.1 Replacing the Single/Three-Phase SPD ................................................................................................................... 89
7.3.2 Replacing the Three-Phase Input Switch (Circuit Breaker) ..................................................................................... 90
7.3.3 Replacing the Three-Phase Input Switch (Knife Fuse Switch) ................................................................................ 91
7.3.4 Replacing the Fuse of the Knife Fuse Switch .......................................................................................................... 92
7.3.5 Replacing the Single-Phase Input Switch ................................................................................................................ 93
7.3.6 Replacing the PLC CCO Module ............................................................................................................................ 94
7.3.7 Replacing the SmartLogger2000 ............................................................................................................................. 94
7.3.8 Replacing the Power Adapter .................................................................................................................................. 96
7.3.9 Replacing the PID Switch ........................................................................................................................................ 96
7.3.10 Replacing the PID Module .................................................................................................................................... 98
7.3.11 Replacing the 24 V DC Power Module ................................................................................................................ 100
7.3.12 Replacing the Fiber Adapter ................................................................................................................................ 101
7.3.13 Replacing the USB Port ....................................................................................................................................... 101
7.3.14 Replacing the 24 V DC Input and Output Switches ............................................................................................. 103
8 Technical Specifications .......................................................................................................... 104
A Configuring the DI7 and DI8 Ports ...................................................................................... 106
B Configuring the COM1 Port and COM2 Port ..................................................................... 107
Issue 05 (2019-01-20)
Copyright © Huawei Technologies Co., Ltd.
Contents
vi

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents