Ignition System - Suzuki VZR1800 2007 Service Manual

Table of Contents

Advertisement

10-22
ELECTRICAL SYSTEM

IGNITION SYSTEM

ECM
CKP
sensor
Waveform
arrangement
circuit
NOTE:
The fuel cut-off circuit is incorporated in this ECM in order to prevent over-running of engine. When engine
speed reaches 7 200 r/min, this circuit cuts off fuel at the fuel injector. But under no load, the clutch lever is
pulled or the gear position is neutral, this circuit cuts off fuel when engine speed reaches 7 100 r/min.
#
Under no load, the engine can run over 7 100 r/min though the fuel cut-off circuit is effective,
which may possibly cause engine damage. Do not run the engine without load over 7 100 r/min
at anytime.
Power source
circuit
CPU
TP
ECT
GP
sensor
sensor
switch
Engine stop switch
Side-
stand
#1 (R)
relay
#1 (R)
Fuse
Ignition
#2 (F)
switch
Fuse
#2 (F)
Battery

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vzr1800 2008Vzr1800n 2008Vzr1800/nk9 2009

Table of Contents