4 PIPING REQUIREMENTS

All fluid connections to the unit, with the exception of the condensate drain, are sweat copper. Factory-installed piping
brackets must not be removed. Field-installed piping must be installed in accordance with local codes and must be
properly assembled, supported, isolated and insulated. Avoid piping runs through noise-sensitive areas, such as office walls
and conference rooms.
Refer to specific text and detailed diagrams in this manual for other unit-specific piping requirements.
All piping below the elevated floor must be located so that it offers the least resistance to air flow. Careful planning of the
piping layout under the raised floor is required to prevent the air flow from being blocked. When installing piping on the
subfloor, we recommend that the pipes be mounted in a horizontal plane rather than stacked one above the other. Whenever
possible, the pipes should be run parallel to the air flow.
The pipe connection locations, piping general arrangement and schematics are described in the submittal documents
included in the
Submittal Drawings
The following tables list the relevant documents by number and title.
Table 5.1 Piping General-arrangment Drawings
Document Number
DPN004561
DPN004138
DPN004562
Table 5.2 Piping Connection Drawings
Document Number
DownflowUnitswithECFans
DPN002036
DPN002035
DPN002034
DPN001628
DPN001693
DPN002434
UpflowUnitswithForward-curvedBlowers
DPN001668
DPN001669
4 Piping Requirements
on page 109.
Title
PipingSchematic, Downflow, CW038to CW114
PipingSchematic, Downflow, CW146andCW181
PipingSchematic, Upflow, CW038to CW114
Title
ConnectionLocations, CW038to CW041
ConnectionLocations, CW051 and050
ConnectionLocations, CW075 to CW084
ConnectionLocations, CW106andCW114
ConnectionLocations, CW146andCW181
ConnectionLocations, CW300 andCW400
ConnectionLocations, CW038to CW084
ConnectionLocations, CW106andCW114
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents