Unpacking The Unit; Removing The Unit From The Skid With A Forklift - Vertiv Liebert CW Series Installer And User Manual

Thermal management system
Table of Contents

Advertisement

3.3 Unpacking the Unit

1.
Remove the exterior stretch wrap packaging from around the unit and any planks tightened with the stretch
wrap, exposing the protective corner and side packaging planks, as shown in 3.3 above.
NOTE: The bag may remain in place to protect from dust and to protect the unit panels, or it may be
removed for immediate installation.
2. Remove the bag from the unit when ready to remove the skid and install the unit.
Figure 4.2 Unpacking the Unit
Item
Description
1
Remove exterior wrapfrom unit
2
Remove corner andside packagingplanks
3
Leave the bagonthe unit until ready to install.

3.3.1 Removing the Unit from the Skid with a Forklift

Refer to Figure 4.3 on the next page.
1.
Align a forklift with either the front or rear side of the unit.
Ensure that the tines of the fork lift are locked to the widest location.
Use the center of gravity indicators on the unit panels when determining the entry points for the tines.
Center of gravity varies per unit size and selected options.
The tines shall be equally spaced on either side of the center of gravity indicator.
2. Insert the tines of the forklift completely under the base of the unit.
Ensure that the tines are level, not angled in an upward direction.
The tines are to be at a height that will allow proper clearance under the unit.
Ensure that the tines extend beyond the opposite side of the unit.
NOTE: If these steps are not followed, damage may occur to the panels and/or base of the unit.
3 Equipment Inspection and Handling
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents