HP StorageWorks Edge Switch 2/12 Installation Manual page 34

Hide thumbs Also See for StorageWorks Edge Switch 2/12:
Table of Contents

Advertisement

Installing and Configuring the Edge Switch 2/12
6. After successful POST completion, the green power (PWR) LED remains
7. If a POST error or other malfunction occurs, refer to the HP StorageWorks
34
ON and all other front panel LEDs turn OFF.
Edge Switch 2/12 Service Manual to isolate the problem.
Edge Switch 2/12 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents