Cisco ONS 15454 Manual page 33

Turning up a node
Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Turning Up a Node
• Expanded ROADM node:
Step 2
On the front of the patch panel tray, push the tabs on the left and right sides inward to release the lock on the
tray.
Step 3
Pull the patch panel tray away from the shelf until it is fully opened.
Note
Step 4
Depending on the type of patch panel tray you are using:
• Standard patch panel tray:
• Deep patch panel tray:
• Two 32WSS cards, optionally, two 32DMX or 32DMX-O cards, and two standard or deep patch
panel trays
• Two 32WSS-L cards, optionally, two 32DMX-L cards, and two standard or deep patch panel trays
• Two 40-WSS-C or 40-WSS-CE cards, optionally, two 40-DMX-C or 40-DMX-CE cards, and two
standard or deep patch panel trays
• Two 40-SMR1-C cards and two 15216-MD-40-ODD, 15216-EF-40-ODD, or 15216-MD-48-ODD
patch panels
• Two 40-SMR2-C cards and two 15216-MD-40-ODD, 15216-EF-40-ODD, or 15216-MD-48-ODD
patch panels
• Two 80-WXC-C cards and two 15216-MD-40-ODD, 15216-EF-40-ODD, or 15216-MD-48-ODD
units and 15216-MD-40-EVEN, 15216-EF-40-EVEN, or 15216-MD-48-EVEN units and two
15216-MD-ID-50 or 15216-MD-48-CM units
• One 16-WXC-FS card, one 15216-MD-48-ODD unit, 15216-MD-48-EVEN unit, and one EDRA-2
• Two of 40-WSS-C/40-WSS-CE cards and 40-DMX-C/40-DMX-CE cards, and two 40-channel
patch panel trays, preinstalled with MPO-LC cables
Note
If you are using standard patch panels, you will also need eight multifiber push-on (MPO)
cables per standard patch panel. MPO cables are fiber-optic cables terminated on one end
with one MPO connector and with eight LC-type connectors on the other end. Deep patch
panel trays come preinstalled with MPO cables.
The red latch inside the patch panel tray at the top left corner will automatically click and lock the
tray in the open position when you have fully opened the tray.
• Complete the
DLP-G315 Installing Fiber-Optic Cables From the 32WSS/32DMX and
32MUX-O/32DMX-O Cards to the Standard Patch Panel
• Complete the
DLP-G316 Installing Fiber-Optic Cables from TXP, MXP Cards to the Standard Patch
Panel
Tray.
• Complete the
DLP-G356 Installing Fiber-Optic Cables from the 32WSS/32DMX and
32MUX-O/32DMX-O Cards to the Deep Patch Panel
• Complete the
DLP-G357 Installing Fiber-Optic Cables from the TXP, MXP Cards to the Deep Patch
Panel Tray or 40-Channel Patch Panel
NTP-G140 Installing Fiber-Optic Cables Between Terminal, Hub, or ROADM Nodes
Tray.
Tray.
Tray.
Turning Up a Node
33

Advertisement

Table of Contents
loading

Table of Contents