Lifetime PUMP ADJUST 90469 Assembly Instructions Manual page 6

Basketball system
Hide thumbs Also See for PUMP ADJUST 90469:
Table of Contents

Advertisement

SECTION 1 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
30" Rebar
1.4
• Slide the dimpled end of the Bottom Pole (ALE) into the cement up to the 16-inch mark. Position the pole next
to the playing surface. For regulation courts, the Alignment Frame (BGW) should cross the playing surface at the
middle of the scored measurements.
!
• Use a Level to make sure the Bottom Pole is standing vertical. Form the cement into a
downward slope away from the pole to allow water runoff. Failure to do so may result in
premature rusting of the Pole.
1.5
• Insert the 30" rebar (not included) inside the Bottom Pole (ALE) so it is about 15" from the top of the pole. Check
the pole several times within the fi rst hour to make sure that all sides are vertical and that the 16-inch mark remains level with
the surface.
ALE
Rebar
6
!
• If the pole is buried too deep or too shallow,
the rim will not to be at the correct height.
TOP VIEW
BGW
ALE
!
• Do not continue the assembly until the
concrete has been allowed to set for 1-4 hours.
Playing
Surface

Advertisement

Table of Contents
loading

Table of Contents