SECTION 4 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
3/4" (19 mm)
(2)
(1)
4.5
• Place the Cap (ALM) to the Top Pole (ALH). Then attach the Upper Extension Arms (BGO) to the Top Pole (ALH) with the hardware as
shown.
ALM
AAX
5"
AQD (x1)
ALH
ABN
BGO
ANK
AAX (x1)
ANK (x2)
ANK
BGO
ABN
18
ABN (x2)
AQD
!
• Tighten the Nut until it is
fl ush with the end of the
Bolt.