SECTION 5 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
(1)
9/16" (14 mm)
(2)
5.6
• Position the Handle Frame (CKJ) inside of the Top Handle (CKH) and Bottom Handle (CKI) as shown, and secure with the
hardware shown.
5.7
• Secure the Pump Adjust Actuators (CMR) to the Handle with the hardware shown.
!
• Tighten the Nut (ABB) until it is fl ush with
the end of the Bolt (FHM).
ADT (x7)
FHM (x1)
CKH
FHM
CKV
CMR
ABB (x1)
CKJ
CKI
ADT
ADT
ADT
ADT
ADT
ADT
CKV
ABB
CMR
25
CKV (x2)
ADT