Checking The Water Level, Topping Up - Fayat Group Bomag BW 138 AD-5 Operating Instruction, Maintenance Instruction

Tandem
Table of Contents

Advertisement

Checks prior to start up – Checking the water level, topping up
5.9

Checking the water level, topping up

Fig. 71
Fig. 72
1. Check the filling level on the water level
gauge, fill up if necessary.
Protective equip-
ment:
NOTICE!
Components may get damaged
by frost!
– Follow the special maintenance
instructions in case of frost
Ä Chapter 8.12.4 „Measures if
there is a risk of
frost" on page 205.
NOTICE!
Dirty or contaminated water can
block the water spraying system!
– Fill only with clean water.
1. For topping up unscrew the filler cap (1)
and fill in clear water through the strainer
(2).
2. Make sure that the ventilation bores in the
filler cap are free.
3. Screw the filler cap back on again.
BW 138 AD-5
n
Working clothes
Protective gloves
n
99

Advertisement

Table of Contents
loading

Table of Contents