Fayat Group Bomag BW 138 AD-5 Operating Instruction, Maintenance Instruction page 133

Tandem
Table of Contents

Advertisement

Fig. 127
Fig. 128
Fig. 129
5. Clean the spreading beam from any dirt,
from asphalt in particular.
6. Fold the spreading beam back up and
fasten it with star handle screws.
7. Close the cover.
8.
NOTICE!
Components may get dam-
aged!
– Do not guide the water jet
into the sealing elements of
the sliding profiles.
Clean the guide rod from any dirt, espe-
cially from asphalt.
BW 138 AD-5
Operation – Chip spreader
133

Advertisement

Table of Contents
loading

Table of Contents