Fold Down The Foldable Rops - Fayat Group Bomag BW 138 AD-5 Operating Instruction, Maintenance Instruction

Tandem
Table of Contents

Advertisement

Loading / transporting the machine – Loading the machine
7.2.1

Fold down the foldable ROPS

Fig. 143
144
The foldable ROPS can be folded
down to reduce the transport height.
5. Fold down the foldable ROPS, if necessary
Ä Chapter 7.2.1 „Fold down the foldable
ROPS" on page 144.
6. If necessary fold down the foldable ROPS
with protective roof
„Folding down the foldable ROPS with pro-
tective roof" on page 145 (optional equip-
ment).
1. Loosen the eye bolts and adjust the
clamping plates vertically.
2.
CAUTION!
Head injuries caused by
folding the foldable ROPS!
– Do not step into the slewing
area of the foldable ROPS.
Fold the foldable ROPS back.
BW 138 AD-5
Ä Chapter 7.2.2

Advertisement

Table of Contents
loading

Table of Contents