Frame Assembly - Rigid Models - Landoll SOIL MASTER II 1200 Series Operator's Manual

Table of Contents

Advertisement

3-1 FRAME ASSEMBLY - RIGID MODELS

WARNING
DO NOT ATTEMPT TO LIFT HEAVY
PARTS (SUCH AS THE FRAME, COUL-
TER GANGS, AND PULL HITCH) MANU-
ALLY. USE A HOIST OR A FORK LIFT
TO MOVE THESE PARTS INTO POSI-
TION.
3-1.1
Bolt together loosely using 5/8-11 x 2" hex
head cap screws and hex lock nuts (See
Figure 3-1).
3-1.2
Install slow moving vehicle mounting angle
at top rear hole of frame halves (See Figure
3-1). Install SMV socket using hardware pro-
vided.
3-1.3
Block frame assembly up approximately
36" high in an open level area.
3-1.4
Install center shank mount with u-bolts and
5/8-11 hex lock nuts between frame halves.
(See Figure 3-1) (Refer to Figures 2-1
through 2-6 for location). Tighten joining
bolts and u-bolts to recommended torque
making sure center shank mount is square
with frame.
3-1.5
Mark tool assembly center lines on frame.
(See Figures 2-1 through 2-6).
3-3

Advertisement

Table of Contents
loading

Table of Contents