HMS Sequence Editor
Fig. 6
Processing order of elements
The processing order can be changed. To do so, right-click on the element, or double-tap the
element if touch functionality is supported. A pop-up menu will appear (See below). Select the
entry Change Processing Order.
Fig. 7
Selecting the element to change the processing order
In the appearing dialog, the processing order value can be changed, ranging from 0 (processed
first) to the number of elements minus one (processed last).
Fig. 8
Changing the processing order of an element
3.2.1
Units
In the following, the behavior of the available units will be described. If not stated otherwise,
units are processed during the process stage of the
Anybus Edge Gateway Reference Guide
IPO
Cycle.