Toro Line Painter 1200 Service Manual page 88

Hide thumbs Also See for Line Painter 1200:
Table of Contents

Advertisement

Transaxle
RIGHT
FRONT
4
15
16
1. Transaxle assembly
2. Flange nut (4 used)
3. Thrust washer
4. Wheel and tire
5. Square key
6. Spacer
Removal (Fig. 4)
1. Park machine on a level surface, stop engine and re-
move key from the ignition switch. Remove high tension
lead from the spark plug and position the lead away from
the spark plug.
2. Disconnect shift linkage from shift lever on transaxle
(see Shift Lever and Linkage in this section).
3. Disconnect brake cable from transaxle (see Brake
Cable Removal in the Service and Repairs section of
Chapter 6 – Chassis).
4. Disconnect brake return spring (item 7) from brake
lever on transaxle.
5. Remove traction drive belt from transaxle pulley (see
Traction Drive Belt Removal in this section).
Traction Drive System
8
9
7
10
11
6
5
ANTISEIZE
3
LUBRICANT
Figure 4
7. Brake return spring
8. Carriage screw (4 used)
9. Cap screw
10. Lock washer
11. Spacer
Page 7 – 6
ANTISEIZE
14
LUBRICANT
13
3
12
1
ANTISEIZE
2
LUBRICANT
12. Shift lever
13. Drive pulley
14. External snap ring
15. Washer
16. E–ring
6. Chock front castor wheel. Raise machine so that rear
of machine is off the ground. Support machine to pre-
vent it from shifting during transaxle removal.
7. Remove rear wheels (see Wheel Removal in the
Service and Repairs section of Chapter 6 – Chassis).
8. Support transaxle to prevent it from falling.
9. Remove four (4) flange nuts (item 2) and carriage
screws (item 8) that secure transaxle to machine.
10.Lower transaxle from machine.
11. If necessary, remove external snap ring (item 14)
and drive pulley (item 13) from transaxle input shaft. Lo-
cate and retrieve woodruff key (not shown).
4
15
5
6
Line Painter 1200
16

Advertisement

Table of Contents
loading

Table of Contents