Service And Repairs; Paint Tank - Toro Line Painter 1200 Service Manual

Hide thumbs Also See for Line Painter 1200:
Table of Contents

Advertisement

Service and Repairs

Paint Tank

144 to 156 in–lb
(16.3 to 17.6 N–m)
192 to 216 in–lb
(21.7 to 24.4 N–m)
RIGHT
FRONT
1. Paint tank
2. Nut
3. Tank support
4. Flat washer
5. Jam nut
6. Elbow fitting
7. Tank clamp (2 used)
Removal (Fig. 4)
1. Park machine on a level surface, stop engine, en-
gage parking brake and remove key from the ignition
switch. Remove high tension lead from the spark plug
and position the lead away from the spark plug.
2. Drain paint tank (see Operator's Manual). Remove
tank lid and strainer.
Paint System
6
5
4
2
1
8
11
10
3
19
8. Rubber washer
9. Outlet port
10. Ball valve
11. Recirculation port
12. O–ring
13. Drain valve
14. Elbow fitting
5
20
7
8
9
10
12
18
Figure 4
3. Loosen nut that secures drain valve to tank (Fig. 5).
4. Remove two (2) flange head screws (item 16) that
secure drain valve to valve bracket. Remove nut from
drain valve and remove valve from machine. Retrieve
o–ring (item 12) from outside tank.
5. Remove agitation tube from elbow fitting (Fig. 5) (see
Quick Disconnect Fitting in the General Information sec-
tion). Loosen and remove elbow fitting.
Page 5 – 12
192 to 216 in–lb
(21.7 to 24.4 N–m)
14
13
15
16
17
15. Valve bracket
16. Flange head screw
17. Flange head screw (4 used)
18. Pump assembly
19. Flush tank
20. Slotted washer
Line Painter 1200

Advertisement

Table of Contents
loading

Table of Contents