Service and Repairs
Traction Drive Belt
1
13
10
1. Traction drive belt
2. Idler pulley
3. Lock nut
4. Shoulder bolt
5. Idler bracket
Removal (Fig. 1)
1. Park machine on a level surface, stop engine and re-
move key from the ignition switch. Remove high tension
lead from the spark plug and position the lead away from
the spark plug.
2. Remove pump drive belt from machine (see Spray
Pump Drive Belt Removal in the Service and Repairs
section of Chapter 5 – Paint System).
3. Loosen flange nuts (item 9) that secure belt guides
to machine. Rotate belt guides away from traction drive
belt.
Traction Drive System
2
12
11
10
6. Extension spring
7. Pivot washer
8. Engine pulley
9. Flange nut (4 used)
3
4
5
6
7
8
Figure 1
4. To allow removal of traction drive belt from idler
pulley (Fig. 2), loosen cap screw (item 12) and lock nut
(item 3) that secure idler pulley to idler bracket. Remove
belt from idler pulley.
5. Carefully remove traction belt from engine and trans-
axle pulleys. Remove traction belt from machine.
Installation (Fig. 1)
1. Position traction drive belt to engine and transaxle
pulleys.
Page 7 – 2
9
10
FRONT
RIGHT
10. Belt guide (4 used)
11. Lock nut
12. Cap screw
13. Transaxle pulley
Line Painter 1200